06
Tue, Oct

Northern Lights fleet ready for phase one as fourth LCO2 carrier arrives from China

Northern Lights fleet ready for phase one as fourth LCO2 carrier arrives from China

Green Energy
Northern Lights fleet ready for phase one as fourth LCO2 carrier arrives from China

The vessel fleet required for first phase operations of the Northern Lights CO2 project in Norway has been completed with the arrival of the fourth liquefied carbon dioxide (LCO2) carrier from China.

Source: Northern Lights

Northern Purpose, custom-designed to transport liquefied CO2 as part of the world’s first cross-border CO2 transport and storage infrastructure, was built at China’s Dalian Shipbuilding Offshore Co. (DSOC) and was christened on May 19.

Following delivery from Dalian, the vessel sailed from Asia to Europe and, as reported today, July 29, has arrived in Norway to support upcoming customer operations. 

The 130-meter-long Northern Purpose is equipped with an LNG dual-fuel propulsion system, a wind-assisted rotor sail and an air lubrication system for lower CO2 emissions.

It is the fourth vessel delivered to Northern Lights, following Northern Pioneer, Northern Pathfinder and Northern Phoenix. The sister vessels have the same design and a cargo capacity of 7,500 m3 each, distributed across two cylindrical pressure tanks.

They will transport CO2 from European emitters to Northern Lights’ CO2 receiving terminal at Øygarden, before it is permanently stored beneath the Norwegian Continental

Content Original Link:

Original Source OFFSHORE ENERGY

" target="_blank">

Original Source OFFSHORE ENERGY

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers