06
Tue, Oct

Cadeler Welcomes Wind Ace WTIV to its Fleet

Offshore Engineer

Cadeler has taken delivery of Wind Ace, its 11th offshore wind turbine installation vessel (WTIV) and the second of three A-class newbuilds.Built over the past two…

Published

(Credit: Credit)
(Credit: Credit)

Cadeler has taken delivery of Wind Ace, its 11th offshore wind turbine installation vessel (WTIV) and the second of three A-class newbuilds.

Built over the past two years at the COSCO Shipping Offshore shipyard in Qidong, China, the vessel was delivered on schedule and within budget, according to Cadeler.

Following mobilization, Wind Ace will prepare for deployment on ScottishPower Renewables' 960 MW East Anglia TWO offshore wind farm in the UK, where Cadeler will transport and install both the project's foundations and wind turbines.

Wind Ace is designed to install both XXL monopile foundations and next-generation wind turbines and can be converted between the two installation scopes within a short period, the company said.

"The delivery of Wind Ace marks another important step in our long-term strategy to build the industry's most capable and versatile fleet. Together with her sister vessel Wind Ally, Wind Ace strengthens our ability to support the next generation of offshore wind projects.

“As turbines and foundations grow larger and projects become more complex, our clients need full-scope installation partners with the capabilities to deliver safely and reliably.

Content Original Link:

Read full article from Original Source OFFSHORE ENGINEER

" target="_blank">

Read full article from Original Source OFFSHORE ENGINEER

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers