06
Tue, Oct

Emerson to Deliver Automation Solutions to Shah Deniz Compression Project

Offshore Engineer

BP has awarded global automation company Emerson a multi-million-dollar contract to deliver automation technologies for the Shah Deniz Compression project off the coast of Azerbaijan…

BP has awarded global automation company Emerson a multi-million-dollar contract to deliver automation technologies for the Shah Deniz Compression project off the coast of Azerbaijan.

This builds on a long-standing collaboration between the two companies, with Emerson previously serving as the main automation contractor for the Azeri Central East and Shah Deniz Stage 2 developments. Under the new contract, Emerson will provide integrated control and safety systems to enhance production, safety and reliability on the new offshore compression platform.

The $2.9 billion Shah Deniz Compression project, which includes an electrically powered, normally unattended offshore production platform, represents the next stage in developing the Shah Deniz field in the Caspian Sea. Designed to access low-pressure gas reserves and maximize overall recovery, the platform will be equipped with four 11MW compressors and serve as the central compression hub for gas from the Shah Deniz Alpha and Bravo platforms. The facility will operate remotely from BP's onshore Sangachal terminal, located 55 km south of Baku.

Emerson’s integrated solution includes its DeltaV Distributed Control System and DeltaV Safety Instrumented System, which provide process control, safety shutdown, fire and gas detection, and power management. Together, these systems deliver real-time visibility and control of critical operations remotely,

Content Original Link:

Read full article from Original Source OFFSHORE ENGINEER

" target="_blank">

Read full article from Original Source OFFSHORE ENGINEER

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers